|
- 70% completed Bearhawk project
- Aircraft built by profesional mechanic (quality of the work done could be request to Bob Barrows and Mark Goldberg who
have seen the project three times)
- More than 85% of final cost included
- Project could be completed in 200/300 hours
- Special Continental Cowling to be finished (including bafles)
- Firewall to be finished (install all engine controls)
- Windshield to be installed
- Complete Fuel Line (Aux tanks delivered with project)
- Final installation of Wings and controls
- Instrument panel and avionic to be installed
- Final painting on all fabric covered surfaces (100% fabric covered surfaces completed and prepared to be painted)
- Interior features final assembly (all interior features have already been pre-assembled, primered and painted)
click here to download file
For more information please contact the builder:
+52-81-8675-6445
|