Inicio | Noticias | Productos | Ventas | Fotos | Contactos

logo-ade-final-mini.jpg

Otros Aeronaves

Bearhawk Project

  • 70% completed Bearhawk project
  • Aircraft built by profesional mechanic (quality of the work done could be request to Bob Barrows and Mark Goldberg who have seen the project three times)
  • More than 85% of final cost included
  • Project could be completed in 200/300 hours
    • Special Continental Cowling to be finished (including bafles)
    • Firewall to be finished (install all engine controls)
    • Windshield to be installed
    • Complete Fuel Line (Aux tanks delivered with project)
    • Final installation of Wings and controls
    • Instrument panel and avionic to be installed
    • Final painting on all fabric covered surfaces (100% fabric covered surfaces completed and prepared to be painted)
    • Interior features final assembly (all interior features have already been pre-assembled, primered and painted)
 
 

click here to download file

For more information please contact the builder:
 
+52-81-8675-6445

DSC00213.JPG

DSC00179.JPG

DSC00182.JPG